Joe Maletz Home Page
Captain Joe JJM Consultants Resume Photos Wave Magic Email Home

Experience

Click one of the images below:

START RESUME  EXPERIENCE  INTEREST  EDUCATION PUBLICATIONS  CERTIFICATIONS  AFFILIATIONS GO HOME

Joe's Experience Summary

Has 42 years of experience in providing engineering services for power plants, manufacturing, biotechnical, and industrial facilities. A Principal instrumentation and controls Engineer, configuration management, and procurement expert, he designs and implements modifications to new and operating plants and facilities. Designs and develops systems and software for nuclear, fossil, biotechnical, industrial, and manufacturing clients and can contribute both detailed engineering and project management support.  His instrument , control, and computer skills are transportable to most all industries. He is the Shaw Stone & Webster corporate specialist in I&C and digital controls, as well as many other engineering areas.

Some of the specific projects sucessfully completed are:

  • Is lead instument and controls engineer for the Advanced Passive 1000 MWe (AP1000) nuclear power plants both domestic and in China. The AP1000 project is a Consortium between Shaw Stone & Webster and Westinghouse to build two 1000 MWe Units per plant site. Currently, there are two sites sold. Both sites are in China, at Haiyang and Sanmen, respectively. Shaw Stone & Webster has is subcontracting some of its engineering services to SNERDI (Shanghai Nuclear Engineering & Research Design Institute) in Shanghai, PRC.


  • As an instument and controls expert in nuclear power plants, provided engineering services to upgrade operating nuclear power plants around USA for power uprates and other life extension and enhancement upgrades.  The work included preparing engineering and licensing reports.


  • Designed and engineered a new condensate polisher systems and building for a power plant. The design included programmable logic control (PLC) and monitoring for all systems. Was innovative in implementing the project as mostly electronic and paperless. The reduction in paper and electronic creation of drawings and documents allowed speed and convenience for review, communications, and design within Stone & Webster and between the client and vendors.


  • Performed engineering reviews and owner oversight tasks for Integrated Vehicle Highway Systems for the Big Dig and Tunnel Projects in Boston.


  • Developed configuration and maintenance management programs at former Soviet Russian power plants in Ukraine and Lithuania.


  • Designed and engineered new Coolant Recycle Systems for the manufacturing of jet engines. Designed and engineered Wastewater Treatment Systems at industrial plants.


  • As a world expert, provided services to determine optimum methods to detect leaks from main steam lines of power plants for "leak before break" design requirements.


  • Provided services to develop total remaining value of a power plant destroyed by fire for an insurance company.


  • Provided services to utilities to develop descriptions and cost of older power plants for the purpose of selling them as a result of the electric industry deregulation.


  • Provided hardware and software support functions for all PC based computers in corporate headquarters. He has provided Help-Desk functions to answer and solve PC software and hardware problems. Currently is a consultant to the computer department for answering computer-related hardware, software, and application questions for all products currently in use in corporate headquarters.


  • Provided due diligence reviews for clients intending to purchase a share in a co-generation plant.


  • Provided engineering reviews for an insurance company to determine the cash value of a co-generation power plant partially destroyed in a fire.


  • Performed engineering and design tasks for low NOx modifications to fossil powered plants.


  • Designed and engineered the balance of plant control and interface systems for a new pressurized water reactor standard plant design that is now approved by the NRC.


  • Designed and engineered new and retrofit systems for existing nuclear power plants, including redesigning technical support centers to satisfy NRC requirements. Designed and engineered Inadequate Core Cooling Monitoring Systems (ICCMS) for pressurized water reactors, anticipated transient without scram (ATWS) systems, and control room design reviews.


  • Provided demolition, decommissioning, and engineering services for a test reactor facility.  Developed detailed specifications, drawings, and construction strategies.


  • Provided procurement engineering management services, including developing engineering database programs for dedicated commercial-grade existing plant equipment and future purchases. In addition, he can develop software, which is provided to clients for their continuing use, to input and implement such programs.


  • Performed a wide variety of design and engineering tasks for utility clients. Developed test programs for molded case circuit breakers and has designed technical support centers incorporating computer-based control rooms and consoles; data acquisition multiplexed systems providing NUREG-0696 emergency response facilities outputs; and ICCMS for nuclear power plant units. Performed human factor reviews and directed related human factor implementation programs.  Prepared elementary diagrams, one-line diagrams, panel drawings, and bills of materials.


  • Performed configuration management tasks at nuclear power plants. Developed Design Basis Documents (DBDs), Topical Design Criteria (TDC), and computerization of plant configuration data.  Responsible for gathering and documenting plant configuration data to input into new plant Emergency Response System (ERF) computers.


  • Provided design, startup, testing, and de-bugging for a biotechnical pharmaceutical facility.


  • Provided project design, engineering, procurement, and installation for the Condensate Polisher Systems at a power plant. Developed control panel and equipment skid requirements to ensure successful design, construction, and implementation of the systems. Successfully diagnosed and "debugged" various control panel and skid design problems and inadequacies, conflicts with station and specification requirements, and drawing errors during the design stage, prior to manufacturing, saving costly construction modifications and schedule delays.


  • Provided extensive engineering and design services for modifications to many nuclear power plants including field changes and change requests. Prepared many types of specifications and procurement support including technical bid evaluations and supplier documentation reviews.  Performed FSAR reviews, design input reviews, Q-List changes, new and revised bill of materials and data sheets, and technical manual reviews.   Provided many environmental qualification tasks including seismic design input, test, and evaluations of I&C equipment.


 

 START RESUME EXPERIENCE  INTEREST  EDUCATION PUBLICATIONS  CERTIFICATIONS  AFFILIATIONS GO HOME